The final episode of Project Shurfun is online now!
by Shurhold 5 Oct 2018 21:48 PDT

Project SHURFUN Episode 4 © Shurhold
Join us as the owner of Mate Series stops by Shurhold Studios to install their combo rod holder/cup holders in the gunnels of the Albury.
Watch Barry and Sam work on a large punch list of final items, from wiring the new stereo speakers to polishing the stainless work. Then, after applying a protective coat of Pro Polish wax and splashing her in the water, Barry puts the boat through its paces for the first time since the rebuild began!