Please select your home edition
Edition
PredictWind - Routing 728x90 TOP

Hoist process step 2 - check the sailor is ready before pumping on the handle to raise them up (the sling will gradually tighten around them and could be painful if not in the right place)

© Magnus Smith
Hoist process step 2 - check the sailor is ready before pumping on the handle to raise them up (the sling will gradually tighten around them and could be painful if not in the right place) photo copyright Magnus Smith taken at Frensham Pond Sailability and featuring the Hansa class
HansaFrensham Pond Sailability
Cyclops Marine 2023 November - FOOTERFestival of Sails 2026Switch One Design