Jarrett Bay Boatworks new construction updates: Hull #68, Hull #65, Hull #64
by Jarrett Bay Boatworks 9 Jun 2023 05:43 AEST

Hull #68: 90' Sportfisherman © Jarrett Bay Boatworks
Hull #68: 90' Sportfisherman
So much has been completed on the 90-footer including stringers, ribbands, aluminum beds for engines and gyro stabilizers and the transom planking. Next up, prop tunnel planking, bottom planking and hull side planking. A great deal of labor and time has been saved so far on this new build thanks to our C-N-C machine!
View construction gallery
Hull #65: 64' Sportfisherman
Detail work continues all over the boat from the mezzanine to the bridge and in the salon and down forward. Mechanical and electrical runs are being covered with furniture and wall panels as this boat heads toward her launch only a few weeks out!
View construction gallery
Hull #64: 68' Sportfisherman
The salon floor has been brought to a brilliant mirror finish on the bottom - the engine room ceiling surface - as we approach Hull 64's big day in the sun for engine, generator and gyro installation along with dry-fitting of the salon floor, cabin top and bridge surround.
View construction gallery