Please select your home edition
Edition
J Composites J/99

Alinghi 5 - with what some believe could be a ballast water pipe highlighted with the red arrows. To our eyes the pipe diameter appears to be too small, however the water would be fed under pressure, rather than gravity fed as with other ballast systems.

© David Lenoir
Alinghi 5 - with what some believe could be a ballast water pipe highlighted with the red arrows. To our eyes the pipe diameter appears to be too small, however the water would be fed under pressure, rather than gravity fed as with other ballast systems. photo copyright David Lenoir taken at  and featuring the  class
SOUTHERN-SPARS-AGLAIA-SPARS_728X90 BottomPredictWind - Routing 728x90 BOTTOM37th AC Store 2024 - 728x90 BOTTOM