sail-world.com
 
 
News Home Cruising Photo Gallery Video Gallery

 

Sail-World.com : How long to build an America's Cup multihull?

How long to build an America's Cup multihull?

'Groupama3 and skipper Franck Cammas (FRA) who is working with BMW Oracle Racing on their Challenger, expected out of the shed in early May.'    Yvan Zedda ©    Click Here to view large photo

In light of the current dilemma regarding Alinghi and Oracle disagreement on a Match date, Sebastien Destremau decided to speak with one of the most successful maxi multihull builder/designer’s in the World, Gilles Ollier from Multiplast who openly insists 'It is impossible to build a 90 ft multihull in less than 8 months!'

Coincientally, Sail-World had the same discussion, on Tuesday, with a leading New Zealand boatbuilder who assurred us that it would be easily possible to build an America's Cup specification multihull in six months. By comparision the build time for an America's cup class yacht is five months.

It has not been announced when the Golden Gate Challenger will emerge from the building shed, however it is expected very soon (by May) and that will leave two months for work up in Valencia, which appears to be the likely venue for the 33rd America's Cup Match.

On 29 December, Golden Gate YC announced that they had stopped negotiating with Societe Nautique de Geneve for a multi-challenger, conventional America's Cup event and it can be assumed from this comment that they had got beyond the point of no return in their build program (just over three months ago). Allowing for design etc from 11 July 2007 the time scales would indicate they, too, were probably on a six month build program.

However read on:

Sebastien Destremau: Gilles, can I ask you to first introduce yourself and your experience in designing and building maxi multihull’s?

GO: I created Multiplast in 1981. The year Formula One cars started using the carbon fiber to build their vehicle. In 1982/1983 we built our first all carbon boat Credit Agricole. Our techniques were developed and in 1987/88 we started using 'the oven technology' and have never looked back ever since.

SD: So you have been building multihull for the last 25 years. What are the boats you have been building for the past, say, ten years?

GO: We have built several America’s Cup boats, the latest being in 2002 for the French team and some Orma 60 footers. As far as maxi multihulls are concerned, we’ve built the triplets for the Race 2000 (Club Med, etc,…) from design to construction. After these catamarans, we did Geronimo (VPLP design), Orange 2 (Ollier Design) and Groupama 3 (VPLP Design).

SD: I note that your designs are all catamarans whilst VLPL’s are trimarans. Can you elaborate on that?

GO: We believe catamarans are better for offshore racing and much simpler to design and build. You’ve got to remember that the program for these multi’s is generally to sail around the World so we look for safety as well as performance. There is no doubt that a Trimaran is much better suited for inshore racing or windward leeward type courses however they are trickier and take longer to build. They are also much more powerful as the ratio length/width is one for one as opposed to two for one for a cat.

SD: Trickier and longer to build?

GO: Yes. If you build a catamaran you can have one mould for both hulls and two crossbeams that can be of a similar design. Consequently you are saving a lot of time in the building process. The Tri’s are trickier because you obviously have to build three moulds, and you can have all the latest development features like foils, canting mast etc… and all of these consume a lot of productivity time in order to perform. Where as on a big Cat’s, these ‘features’ do not yet exist.

SD: How long did it take you to build some of your profile 'beasts'?

GO: You are always pressured by external concerns like late sponsors’s decisions or last minute changes from the skippers or the design team. It took us 18 months to build Groupama 3 keeping in mind that we were not the designers (VPLP) and this tends to extend the building process.

Orange 2 was completed in 14 months. We are very proud of this achievement but we needed to employ 50 peoples to work the 100 000 hours necessary to build her.

With our experience track record in delivering these boats, we are very confident in our technology and process. To give you an example: We test each bucket of resin used and keep a record of it. I could give you the test results of the resin used to build Groupama 3 aft cross beam if need be. We also test each boat in the yard during one month before their sea-trial.

SD: 14 months for Orange 2?

GO: Yes, from conception to delivery. Bear in mind that three months are required to build the tools and moulds. This period of time can be reduced, if you are extremely well organized and plan in advance.

Also, some parts of the construction can be outsourced but again this takes a fair bit of forward planning and project management. Outsourcing has never been easy in our business and I personally try to avoid it for quality control purposes.

SD: I believe that Team Dennis Conner built not one, but two cats in 6 months twenty years ago. How did he manage to do that then when it took you 14 months to build Orange 2?

GO: You are right. Firstly they were only 60 foot long and extremely simple in design. A bit like a Tornado: two hulls and two cross beams, period, done, finished. The only developments were in the sails with a soft and a rigid mainsail but these were outsourced. It is definitively not comparable with an Orange 2, Groupama or Geronimo!

SD: So if I was to provide you with a complete set of plan’s for a 90 x 90 ft multihull today and asked you to build my boat for the America’s Cup match. What would you say?

GO: I would be very pleased especially if money is not an issue! (laugh) More seriously, I wouldn’t be ready to start building tomorrow that’s for sure! I would have to study the design, talk to your people, have meetings, and develop the tools etc before I can even consider laying the first piece of wood to build the pre form. Think about the carbon’s supply? Four to six weeks minimum for such high tech Carbon. And it comes from Japan too!

So lets say that your design team is extremely well organized and they give me the best set of designs I’ve ever seen. I would hire a large group of technicians and organize them on two eight hours shifts within a 24hour period.

SD: Two shifts? Why not three and work around the clock?

GO: Three x eight hours is not an option for us. The carbon has to dry and cure from time to time!

SD: Ok two shifts. What then?

GO: It is absolutely impossible for me to build a boat like this in less than eight months. Six if I can outsource to already contracted boat builders. Eight months would be a major achievement to deliver a boat like this keeping in mind that she wouldn’t be ready to sail within this time frame.

SD: Six to eight months and she is not even ready to sail? So how long before I can have my boat ready to race then?

GO: Ok, you can have your boat in eight months. Sailing? Maybe add another few weeks if all goes well. Now if you are talking about racing then think twice. Your boat is not going to be race ready until several months later.

Trimarans are extremely powerful, super light and rigidity is key to performance in multihull’s. This equation is like dynamite and it is very common to have serious breakages with this kind of boat when they are first launched. Remember Groupama 3’s accident last month? Well, how long did it take for Franck and his boys to build and develop her? Years!

Let me put it this way. It is easy for me to build a nice piece of art inside eight months for you. HOWEVER it will be a boat for a show room and certainly not a boat ready to race!!

After a couple of weeks of sea trials, you’ll probably loose a part of the hull, or break a mast or destroy a foil or maybe all of these altogether. This will set you back another month or two… so on and so forth.

These boats are a nightmare compared to an America’s Cup boat. A Cup boat is so easy to engineer, to build; there is nothing inside them! But a 90 x 90 f




by Sebastien Destremau and Sail-World

  

Click on the FB Like link to post this story to your FB wall

http://www.sail-world.com/index.cfm?nid=43377

7:28 PM Wed 9 Apr 2008 GMT






Click here for printer friendly version
Click here to send us feedback or comments about this story.

Click for further information on
2013 America's Cup

Related News Stories:

20 Sep 2014  NZL Sailing Team: Images from Day 8 of the ISAF Worlds at Santander
20 Sep 2014  NZLYT Optimist Worlds Team Fundraiser next Sunday at Richmond YC
20 Sep 2014  NZL Sailing Team: 49ers keep lead despite drama - ISAF Worlds - Day 8
18 Sep 2014  NZL Sailing Team: More images from Day 6 of the ISAF Worlds
18 Sep 2014  NZL Sailing Team: Images from Day 6 of the ISAF Worlds at Santander
18 Sep 2014  NZL Sailing Team: Burling and Tuke lead in 49er at ISAF Worlds
17 Sep 2014  Red Bull 49erFX: On the eve of the Worlds in Santander
17 Sep 2014  NZL Sailing Team: 49ers open well at ISAF Worlds in Santander
16 Sep 2014  NZL Sailing Team: No racing for most but one win at ISAF Worlds Day 4
15 Sep 2014  NZL Sailing Team: Slow start for both 470's at ISAF Worlds - Day 3
MORE STORIES ...

News - USA and the World





Big Boat Series - It's not the size, it's the length by Erik Simonson, Pressure-Drop.US,




























470 Men and Women Worlds - Champs take over leaderboard by 470 International Association Class,


































AWT Hatteras Wave Jam action commences on day 3
Rolex Big Boat Series: Images from San Francisco - Final Day
ISAF Sailing World Championships - Watch medal races live here
Hobie 16 Open North American Championships and Pan Am Games qualifier
ISAF Sailing World Championship - Videos from Santander
ISAF Sailing Worlds: Buckingham into Medal Race, 470's stay consistent
470 Men and Women Worlds - Vadlau and Ogar into pole position
2014 Chicago Match Cup - Defending champion on top
ISAF Sailing Worlds, Santander - Strong competition for RS:X fleets
ISAF Sailing Worlds, Santander - Big breeze on day 6 + Video
ISAF Sailing Worlds, Santander - Buckingham into Laser Medal Race
U.S. Multihull Championship - Hobie Alter Trophy to be decided
ISAF Sailing Worlds - The kind of form most sailors only dream about
Royal Cup Marina Ibiza - Quantum Racing ahead of target
ISAF Worlds Santander - 19 Rio 2016 Laser Radial spots awarded
Santander 2014 ISAF Worlds - 21 broadcasters to take live coverage
Rolex Swan Cup - Looking forward to the next 30 years
America’s Cup: The Future is foiling – AC45s to be modified
Volvo Ocean Race: Win a stopover trip by designing an ECsix T-Shirt
Red Bull 49erFX: On the eve of the Worlds in Santander
America's Cup: Ben Ainslie Racing launches partnership with Yamaha   
2014 Chicago Match Cup - Starts tomorrow   
Rio 2016 Daylight the issue for Olympic sailing regatta   
ISAF Sailing World Championships - USA 470's and Lasers battle at top   
ISAF Sailing World Championships - Santander - Day 5 video highlights   
ISAF Sailing World Championships - Santander images by Jesús Renedo   
PWA Cold Hawaii World Cup - No action on day 2   
470 Men and Women Worlds - Game on for Olympic Qualification   
ISAF Sailing World Championships: Finns off to slow start in Santander   
ISAF Sailing World Championships - Seesaw Day 5 in Santander + Video   
ISAF Sailing World Championships - 470 sailors shine in Santander   
Royal Cup Marina Ibiza - Kiwi Ray Davies returns to TP52 fleet   
Starboard Hatteras Wave Jam - No windsurfing action on day 1   
A complete recap of the most successful Melges 20 World Championship   
Rolex Big Boat Series - Prizegiving images by Chuck Lantz   
ISAF Santander - Upwards path for Austrian women's 470 crew + video   
18ft skiffs: Carnage compilation from the glory days of the Grand Prix   
ISAF Worlds: Video from the British Sailing Team   
Bart's Bash expected to set new records this weekend   
PWA Cold Hawaii World Cup - Marcilio Browne wins Super Session   


For this week's complete news stories select    Last 7 Days
   Search All News
For last month's complete news stories select    Last 30 Days
   Archive News







Sail-World.com  


















Switch Default Region to:

Social Media

Asia

Australia

Canada

Europe

New Zealand

United Kingdom


http://www.sail-world.com/event_images/image/Twitter_logo_small.png http://www.sail-world.com/event_images/image/FaceBook-icon.png  http://www.sail-world.com/event_images/image/RSS-Icon.png

United States

Cruising Northern

Cruising Southern

MarineBusiness World

PowerBoat World

FishingBoating World

 

Contact

Commercial

News

Search

Contact Us

Advertisers Information

Submit news/events

Search Stories/Text

Feedback

Advertisers Directory

Newsletter Archive

Photo Gallery

 

Banner Advertising Details

Newsletter Subscribe

Video Gallery

Policies

 

 

 

Privacy Policy

 

 


Cookie Policy

 

 



This site and its contents are © Copyright TetraMedia and/or the original author, photographer etc. All Rights Reserved.  Photographs are copyright by law.  If you wish to use or buy a photograph contact the photographer directly.
XLXL NEW US
LocalAds   DE  ES  FR  IT